Musqueam Welcome Pole

  • 20160406-P4060137
  • 20160406-P4060234
  • IMG_2804

On this unique project, Syncra Construction coordinated drawings with landscape, structural, electrical and Geo-technical consultants for the installation of the Musqueam Pole within a Water Feature completed by Syncra in 2012.
Renovations included: salvage of existing landscaping; demotion & installation of concrete foundation and adaptor plate; re-established waterproofing; re-installed landscaping; installed feature lighting; and crane installation of Musqueam Pole (watch the video below).

All UBC Public Realm projects completed by Syncra in 2009-2015.

 

Comments are closed.